Atrium 1 B1/F – 6/F, Gateway II
Demolish existing slab, beam, wall, etc. including supporting and strengthening works. Take down and cart away glass shopfront, railing, partition wall, louver, door, etc.
Supply and install steel strengthening beam
Design, supply and install glass skylight with roller blind, glass box, glass wall, rain shelter, stone cladding, glass balustrade, ceiling, wind-proof aluminium ceiling. Relocate, divert and modification of affected related to builder's works