A&A Works at
Sub-basement to 1/F,
Block A
Harbour City
Demolition and cart away the existing oil tank and oil, chemical waste, pipe work, disable lifting platform, steel staircase and metal walkway and RC structure.
Supply and install steel raised deck, 4hrs FRP durasteel staircase, beams and floor slab and RC structrues.
Supply and install finishes include ceiling, wall, marble, floor tile, acoustic panel.
Design, supply and install glass wall and door, glan cladding.